Commercial Plumbing in Solon, OH | ACC Solutions
Solon, Ohio · Commercial plumbing

Commercial Plumbing in Solon, Ohio: Registration, Permit Fees and Inspections

Planning commercial plumbing work in Solon? Solon will not invoice your permit until every contractor and subcontractor on the job is registered with the city, and a registration certificate lasts only for the calendar year it is issued. The city is already taking 2027 registrations, so a job that straddles New Year needs both years. ACC Solutions coordinates commercial plumbing in Solon, Cleveland and across Cuyahoga County, Ohio, and quotes every job after a walkthrough. Call the plumbing desk at (216) 480-8899 or request a commercial plumbing project review.

By the ACC Solutions Team · Sources checked November 18, 2026

Who wrote this: the ACC Solutions Team (Licensed General Contractor, License #CR25025171). This page summarizes the City of Solon's Contractor Registration, Permit Applications and Inspections pages, its building fee schedule and Codified Ordinance 1424.11, all read November 18, 2026. It's general information, not legal advice. The Building Department at 34200 Bainbridge Road, (440) 349-6737, has the final word on your project.

Registration comes before the permit invoice

Solon's permit page says all contractors and subcontractors must be registered before permit payment and issuance. Once registrations are complete, the city emails an invoice listing the permit costs. So the sequence on a Solon job is application, registration check, invoice, payment, permit. A plumber who isn't registered yet can hold up the whole job even if the drawings are approved.

Under Solon's Chapter 1430, no contractor may perform any work in the city without a certificate from the Chief Building Official, and the list of trades that must register includes plumbing, electrical, HVAC and refrigeration, sewer installers and general building contractors.

What a Solon registration needs for 2027

  • The city's application for a certificate of contractor registration.
  • General liability insurance of $1,000,000 per occurrence and $2,000,000 general aggregate, with the City of Solon listed as an additional insured.
  • A completed, signed and sealed City of Solon contractor registration bond form.
  • For plumbing, electrical, HVAC, hydronics and refrigeration, evidence of a current license from the Ohio Construction Industry Licensing Board. (Fire suppression and fire alarm trades show a State Fire Marshal license instead.)
  • A $100 registration fee, which Chapter 1430 and the fee schedule say covers any trades the applicant lists. Applications can be emailed to the Building Department, and the city invoices card payments.

The certificate is valid for the calendar year it's issued, then renewed. If your plumbing starts in December and the final inspection lands in January, ask the department whether you need the 2026 and 2027 certificates before work continues. The plumbing license behind the registration is the state's: see ORC Chapter 4740.

Nonresidential plumbing permit fees in Solon

Solon publishes a nonresidential fee schedule. For plumbing, it reads:

WorkFee on the city's schedule
New construction and additions, plumbingBase fee of $150 plus $15 for each fixture, trap, appliance device or gas outlet
Interior or exterior renovation or remodelingBy valuation: $125 for $10,000 or less; $175 for $10,001 to $20,000; for $20,001 and over, $175 plus $20 for every $1,000 or fraction thereof
Re-inspection$100

Here is the first line as arithmetic, not a quote: a new addition with 12 fixtures, traps and gas outlets would be $150 + (12 x $15) = $330 in plumbing permit fees. A tenant remodel is a different line, and the schedule doesn't say which one a plumbing-only fit-out uses, so ask the department before you budget. The $100 re-inspection fee is the one we'd plan around: a failed or unprepared inspection costs money on top of the delay.

Review time: 7 to 10 business days

Every permit needs the commercial application, two sets of construction drawings (or one digital copy), and a site plan and elevations where they apply. Commercial applications go through Building, Planning, Engineering and Fire. Solon says review currently takes 7 to 10 business days and notes the state Board of Building Standards allows 30 calendar days. If anything about the drawings changes after approval, the changed documents go back through review and the city invoices the revision.

Scheduling a plumbing inspection in Solon

Requests go by phone to (440) 349-6737, Monday through Friday, 8 a.m. to 4:30 p.m., or by email to the Building Department. Voicemail and email requests are not honored with less than 24 hours' notice. Calls received between 8 and 9 a.m. may be scheduled the same day, depending on staff, and anything received after 9 a.m. goes to the next available business day. The city says plumbing inspections may not be available every day.

Have these ready when you call: the project address, the permit number, the type of inspection, a day-of contact name and phone number, and a.m. or p.m. (specific times can be requested but aren't promised). Because plumbing inspections aren't daily, the rough-in inspection is the one to book as early as the schedule allows, before walls close.

Solon jobs where we expect plumbing questions

Send us this for a Solon walkthrough

  1. The address, what the space is used for and whether you are the owner or the tenant.
  2. A fixture list: what is new, moved or replaced, plus any water heater change.
  3. Whether the work is an addition or an interior remodel, since Solon prices them differently.
  4. Your target start date, so registration and the 7 to 10 business day review can be checked against it.

We walk the space, then quote. We don't quote over the phone without seeing the site, and we don't promise a permit or inspection date; Solon sets those. For what to expect on site, read what happens at a commercial plumbing walkthrough.

Nearby: commercial plumbing in Bedford and commercial plumbing in Warrensville Heights.

Frequently asked questions

Does a plumber need to register with the City of Solon?

Yes. Solon's Chapter 1430 says no contractor, including plumbing, electrical, HVAC and general building contractors, may perform work in the city without a certificate of registration from the Chief Building Official. The registration fee is $100 a year.

What does Solon require to register a plumbing contractor?

The city's application, $1,000,000 per occurrence and $2,000,000 aggregate general liability insurance naming the City of Solon as additional insured, a signed and sealed registration bond form, proof of a current Ohio Construction Industry Licensing Board license, and the $100 fee.

How long does a commercial permit review take in Solon?

The city says review currently takes 7 to 10 business days, and notes the Ohio Board of Building Standards allows 30 calendar days. Commercial applications are reviewed by the Building, Planning, Engineering and Fire departments.

How do I schedule a plumbing inspection in Solon?

Call (440) 349-6737 Monday to Friday, 8 a.m. to 4:30 p.m., or email the Building Department. Requests need at least 24 hours' notice, and plumbing inspections may not be available every day.

How does ACC quote commercial plumbing in Solon?

After a walkthrough. Send the address, a fixture list, whether it is an addition or a remodel and your target start date to the plumbing desk at (216) 480-8899 or support@accmgmtsolutions.com.

Plan your Solon plumbing job

Call the plumbing desk at (216) 480-8899 or request a commercial plumbing project review. Every job is quoted after a walkthrough.

ACC SOLUTIONS

Licensed General Contractor, License #CR25025171
Plumbing desk: (216) 480-8899
Phone: (216) 238-5999 · Email: support@accmgmtsolutions.com · Contact form
6545 Market Ave N, Canton, OH 44721
We work asynchronously, so you can reach us by email or the contact form from any time zone; you don't need to catch us during Ohio business hours.